Tangki Cuci/Elusi GMP 9000L 316LBRINOX 9.000 L Waschlösungsbehälter
BH6752-BH1001 Paket 32
Tangki Cuci/Elusi GMP 9000L 316L
BRINOX 9.000 L Waschlösungsbehälter
BH6752-BH1001 Paket 32
Tahun pembuatan
2020
Kondisi
Baru
Lokasi
Solingen 

Gambar menunjukkan
Tampilkan peta
Data mesin
- Nama mesin:
- Tangki Cuci/Elusi GMP 9000L 316L
- Pabrikan:
- BRINOX 9.000 L Waschlösungsbehälter
- Model:
- BH6752-BH1001 Paket 32
- Tahun pembuatan:
- 2020
- Kondisi:
- baru
- Fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
- Lokasi:
- Landwehrstraße 55-65, 42699 Solingen, Deutschland

Hubungi
Rincian teknis
- Kapasitas tangki:
- 9.000 l
- Perlengkapan:
- dokumentasi / manual
Rincian penawaran
- ID iklan:
- A21242137
- Nomor referensi:
- BH6752-BH1001 Paket 32
- Pembaruan:
- terakhir pada 22.02.2026
Deskripsi
BRINOX 9000 L GMP Washing and Elution Solution Tank
Horizontal Stainless Steel Pressure Vessel – Year of Manufacture 2020 – Complete FAT & GMP Documentation
BH6752-BH1001 Package 32
Manufacturer: BRINOX Process Systems
Serial Number: 1003558
Year of Manufacture: 2020
Nominal Volume: 9,000 liters
Design: GMP-compliant stainless steel pressure vessel
Application
The vessel was used in a pharmaceutical production facility.
Suitable for the preparation, storage, and provision of process solutions in GMP environments.
Construction and Features
Cylindrical stainless steel vessel in horizontal configuration
Process connections on end faces
Large manway with pressure-tight cover
Integrated CIP system with spray ball
Highly polished internal surfaces
Hygienic product-contacting fittings
Multiple measurement and instrumentation nozzles
Documented weld seams with full traceability
Separate stainless steel feet included in delivery
Condition
Visual and technical condition: Very good.
Internal surfaces mirror-polished and clean.
No visible damage to the jacket or connections.
Accessories and attached components as per photo documentation included.
FAT and Documentation Status
According to the FAT documentation “IT-11.1 Welding Documentation Inspection”, the welding documentation was reviewed during the Factory Acceptance Test (FAT 01, 23.10.2020).
The following were confirmed, among others:
Identification of welders and weld seam inspectors
Welder qualifications according to EN ISO 9606-1
WPS and WPQR documentation
Evidence of shielding gas suitability
Documented test welds
Random visual inspection without complaints
Traceability according to 3.1 material certificates
The complete welding documentation is part of the Turn-Over Package.
Kjdpfxoykkk Hs Ac Hewu
Documentation – fully available
FAT plan and FAT report
Layout and construction drawings
P&ID diagrams
Calibration protocols
Surface and roughness measurements
Leak test
Welding plan
WPQR
WPS
Welder qualifications
Borescope inspection report
Goods receipt inspection reports
Sensor calibrations
The complete technical documentation is available in digital format.
Special Features
Fully documented GMP version with verified welding documentation and comprehensive quality package.
Very well suited for reinstallation in pharmaceutical production plants or applications requiring validation.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Horizontal Stainless Steel Pressure Vessel – Year of Manufacture 2020 – Complete FAT & GMP Documentation
BH6752-BH1001 Package 32
Manufacturer: BRINOX Process Systems
Serial Number: 1003558
Year of Manufacture: 2020
Nominal Volume: 9,000 liters
Design: GMP-compliant stainless steel pressure vessel
Application
The vessel was used in a pharmaceutical production facility.
Suitable for the preparation, storage, and provision of process solutions in GMP environments.
Construction and Features
Cylindrical stainless steel vessel in horizontal configuration
Process connections on end faces
Large manway with pressure-tight cover
Integrated CIP system with spray ball
Highly polished internal surfaces
Hygienic product-contacting fittings
Multiple measurement and instrumentation nozzles
Documented weld seams with full traceability
Separate stainless steel feet included in delivery
Condition
Visual and technical condition: Very good.
Internal surfaces mirror-polished and clean.
No visible damage to the jacket or connections.
Accessories and attached components as per photo documentation included.
FAT and Documentation Status
According to the FAT documentation “IT-11.1 Welding Documentation Inspection”, the welding documentation was reviewed during the Factory Acceptance Test (FAT 01, 23.10.2020).
The following were confirmed, among others:
Identification of welders and weld seam inspectors
Welder qualifications according to EN ISO 9606-1
WPS and WPQR documentation
Evidence of shielding gas suitability
Documented test welds
Random visual inspection without complaints
Traceability according to 3.1 material certificates
The complete welding documentation is part of the Turn-Over Package.
Kjdpfxoykkk Hs Ac Hewu
Documentation – fully available
FAT plan and FAT report
Layout and construction drawings
P&ID diagrams
Calibration protocols
Surface and roughness measurements
Leak test
Welding plan
WPQR
WPS
Welder qualifications
Borescope inspection report
Goods receipt inspection reports
Sensor calibrations
The complete technical documentation is available in digital format.
Special Features
Fully documented GMP version with verified welding documentation and comprehensive quality package.
Very well suited for reinstallation in pharmaceutical production plants or applications requiring validation.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Penyedia
Catatan: Daftar gratis atau masuk, untuk mengakses semua informasi.
Terdaftar sejak: 2025
Kirim permintaan
Telepon & Faks
+49 212 2... iklan
Iklan Anda telah berhasil dihapus
Terjadi kesalahan




































