Ameise hand pallet truck Jungheinrich ERC 214Jungheinrich
Ameise Jungheinrich ERC 214
Ameise hand pallet truck Jungheinrich ERC 214
Jungheinrich
Ameise Jungheinrich ERC 214
VB ditambah PPN
€1.100
Tahun pembuatan
2006
Kondisi
Bekas
Lokasi
Sinntal 

Gambar menunjukkan
Tampilkan peta
Data mesin
- Pabrikan:
- Jungheinrich
- Tahun pembuatan:
- 2006
- Kondisi:
- perlu perbaikan (bekas)
- Fungsi:
- tidak berfungsi
- Jam operasional:
- 9.455 h
Harga & Lokasi
VB ditambah PPN
€1.100
- Lokasi:
- Sinntal, Jerman

Rincian teknis
- Kapasitas angkut:
- 1.400 kg
- Tegangan baterai:
- 24 V
- Berat baterai:
- 274 kg
Rincian penawaran
- ID iklan:
- A21731193
- Pembaruan:
- terakhir pada 16.04.2026
Deskripsi
Jungheinrich ERC 214 Electric Pallet Truck (Ameise)
Current Condition:
- The pallet truck is currently not operational:
- Drive switch is defective
- New battery needed
General Terms and Conditions for the Offer:
- Full payment (100%) is required before dismantling begins, without any deductions, upon receipt of invoice.
- The equipment remains our property until full payment has been received.
- The buyer (KT) may withdraw from the contract in writing at any time prior to full payment without stating reasons.
- Ex works; the buyer is responsible for organizing dismantling, loading, and transportation of the equipment at their own expense.
Hnedpfx Aiey Dg N Hj Tek
- The buyer is responsible for proper dismantling and re-commissioning.
- The buyer undertakes to contract only qualified companies for dismantling.
- Dates must be coordinated with KT and adjusted to the plant’s opening hours.
- The dismantling of the equipment must be completed up to the supply lines.
- The plant’s safety regulations must be observed.
- Equipment is sold in the inspected delivery scope, in as-seen condition, without any guarantee or warranty for material or visual defects.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Current Condition:
- The pallet truck is currently not operational:
- Drive switch is defective
- New battery needed
General Terms and Conditions for the Offer:
- Full payment (100%) is required before dismantling begins, without any deductions, upon receipt of invoice.
- The equipment remains our property until full payment has been received.
- The buyer (KT) may withdraw from the contract in writing at any time prior to full payment without stating reasons.
- Ex works; the buyer is responsible for organizing dismantling, loading, and transportation of the equipment at their own expense.
Hnedpfx Aiey Dg N Hj Tek
- The buyer is responsible for proper dismantling and re-commissioning.
- The buyer undertakes to contract only qualified companies for dismantling.
- Dates must be coordinated with KT and adjusted to the plant’s opening hours.
- The dismantling of the equipment must be completed up to the supply lines.
- The plant’s safety regulations must be observed.
- Equipment is sold in the inspected delivery scope, in as-seen condition, without any guarantee or warranty for material or visual defects.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Penyedia
Penjual Profesional
Terakhir online: Kemarin
Terdaftar sejak: 2020
16 Iklan online
Kirim permintaan
Iklan Anda telah berhasil dihapus
Terjadi kesalahan












