Perangkat untuk bubukMalarnia proszkowa Mogielnicki
Perangkat untuk bubuk
Malarnia proszkowa Mogielnicki
EXW harga tetap ditambah PPN
€119.000
tahun pembuatan
2017
Kondisi
Bekas
Lokasi
Dołuje 

Gambar menunjukkan
Tampilkan peta
Data mesin
- Nama mesin:
- Perangkat untuk bubuk
- Pabrikan:
- Malarnia proszkowa Mogielnicki
- Tahun pembuatan:
- 2017
- Kondisi:
- bekas
- Fungsi:
- berfungsi sepenuhnya
- Jam operasional:
- 8.073 h
Harga & Lokasi
EXW harga tetap ditambah PPN
€119.000
- Lokasi:
- 72-002 Dołuje, Polska

Hubungi
Rincian teknis
- Perlengkapan:
- kabin
Rincian penawaran
- ID iklan:
- A20614390
- Pembaruan:
- terakhir pada 26.11.2025
Deskripsi
For sale: a complete, fully operational automatic powder coating line by Mogielnicki.
The equipment was manufactured in 2017 and is in excellent technical condition, having operated only 8,073 hours.
Nodpfx Abexzdi Aegsli
The line comes with full technical documentation and is ready for immediate commissioning.
Equipment includes:
- 5-stage spray washer (washing, rinsing, passivation, drying)
– 8 spray gates, 112 nozzles
– pumps: 101 m³/h, 9.2 kW power
– 3 m³ tank, Riello heater, temperature 50–60 °C
– stainless steel AISI 304
- Tunnel dryer with automatic temperature control
- Cyclone spray booth with platforms
– automatic Gema spray guns (4 units)
– manual Gema spray guns (2 units)
– booth equipped with cyclone and powder paint recovery system, ensuring high process efficiency and reduced material losses
- Powder paint polymerization oven
- Overhead conveyor system – speed: 1 m/min, max 50 kg/m
- Double demineralization station
Technical parameters:
- Maximum part size: 1200 × 500 × 1200 mm (in practice, parts up to approx. 1900 mm long can be coated)
- Required floor space: 25.5 × 15 × 5 m
- Conveyor speed: 1 m/min
- Installed power: 99 kW
Media requirements:
- Heating oil: 77 l/h (start-up), 47 l/h (continuous operation)
- Mains water: 200 l/h
- Compressed air: 58 m³/h (6 bar)
Condition:
The line was used in serial production, maintained in excellent condition with regular servicing.
Fully automatic control – temperature regulators, safety sensors, Riello heating system,
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
The equipment was manufactured in 2017 and is in excellent technical condition, having operated only 8,073 hours.
Nodpfx Abexzdi Aegsli
The line comes with full technical documentation and is ready for immediate commissioning.
Equipment includes:
- 5-stage spray washer (washing, rinsing, passivation, drying)
– 8 spray gates, 112 nozzles
– pumps: 101 m³/h, 9.2 kW power
– 3 m³ tank, Riello heater, temperature 50–60 °C
– stainless steel AISI 304
- Tunnel dryer with automatic temperature control
- Cyclone spray booth with platforms
– automatic Gema spray guns (4 units)
– manual Gema spray guns (2 units)
– booth equipped with cyclone and powder paint recovery system, ensuring high process efficiency and reduced material losses
- Powder paint polymerization oven
- Overhead conveyor system – speed: 1 m/min, max 50 kg/m
- Double demineralization station
Technical parameters:
- Maximum part size: 1200 × 500 × 1200 mm (in practice, parts up to approx. 1900 mm long can be coated)
- Required floor space: 25.5 × 15 × 5 m
- Conveyor speed: 1 m/min
- Installed power: 99 kW
Media requirements:
- Heating oil: 77 l/h (start-up), 47 l/h (continuous operation)
- Mains water: 200 l/h
- Compressed air: 58 m³/h (6 bar)
Condition:
The line was used in serial production, maintained in excellent condition with regular servicing.
Fully automatic control – temperature regulators, safety sensors, Riello heating system,
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Penyedia
Catatan: Daftar gratis atau masuk, untuk mengakses semua informasi.
Kirim permintaan
Telepon & Faks
+48 665 7... iklan
Iklan Anda telah berhasil dihapus
Terjadi kesalahan