Turbin uap1. Brněnská strojírna
Turbogenerator set 25MW
Turbin uap
1. Brněnská strojírna
Turbogenerator set 25MW
EXW VB ditambah PPN
€280.000
tahun pembuatan
1985
Kondisi
Bekas
Lokasi
Republik Ceko 

Gambar menunjukkan
Tampilkan peta
Data mesin
- Nama mesin:
- Turbin uap
- pabrikan:
- 1. Brněnská strojírna
- Model:
- Turbogenerator set 25MW
- tahun pembuatan:
- 1985
- Kondisi:
- bekas
- fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
EXW VB ditambah PPN
€280.000
- Lokasi:
- 117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia
Hubungi
Penjualan mesin

Apakah Anda sudah mengiklankan mesin bekas Anda?
Jual melalui Machineseeker tanpa komisi.
Lebih lanjut tentang penjualan mesin
Lebih lanjut tentang penjualan mesin
Rincian teknis
- Tekanan:
- 90 batang
- Daya:
- 25.000 kW (33.990,50 hp)
- Frekuensi:
- 50 Hz
- Suhu:
- 515 °C
- Berat keseluruhan:
- 34.000 kg
- Kecepatan rotasi (maks.):
- 3.000 rpm
Rincian penawaran
- ID iklan:
- A19313411
- Nomor referensi:
- TG2
- pembaruan:
- terakhir pada 06.06.2025
Deskripsi
1st Brněnská strojírna, Turbogenerator Set, Backpressure Steam Turbine 25MW
Manufacturer: 1st Brněnská strojírna
Power: 25,000 kW
Type: R25-9/1.9
Speed: 3,000 rpm
Inlet Steam Pressure: 90 bar
Exhaust Steam Pressure: 18 bar
Steam Temperature: 515 °C
Year of manufacture: 1985; equipment has received all prescribed maintenance to ensure maximum reliability, availability, and capacity.
Dimensions: 3,000 x 3,000 x 5,100 mm
Weight: 34,000 kg
Includes generator, gearbox, oil system, and all related electrical and instrumentation & control (I&C) equipment.
Comprehensive technical documentation available upon request.
Maintenance:
TG2 has been regularly maintained and serviced since commissioning. Major (GO) and medium (SO) overhauls have been conducted at approximately 5-year intervals, according to actual condition. Operation & Maintenance (O&M) was performed by the turbine manufacturer or certified specialists.
Crsdpfx Aowqp Edod Dsh
Last major O&M was conducted in 2010-2011 at a total cost of €47.3 million, covering:
- Rotor repair with new blading
- Stator flow section repair with new blading
- Replacement of quick-stop and control valve blocks
- Control system repair
- Oil system overhaul, pump repairs
- Steam system overhaul: valves, drains, replacement of hinged steam connections
The most recent overhaul (SO) was carried out in 2022-2023 at a total cost of €22 million, which included:
- Inspection of turbine flow section, cleaning, seal replacement, rotor balancing
- Overhaul and cleaning of oil system, inspection of oil pumps, installation of new radiator tubes
- Overhaul and repair of turbine control system and control safety system
- Inspection of steam pipes and valves
Routine maintenance and servicing were continuously performed during operation.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Manufacturer: 1st Brněnská strojírna
Power: 25,000 kW
Type: R25-9/1.9
Speed: 3,000 rpm
Inlet Steam Pressure: 90 bar
Exhaust Steam Pressure: 18 bar
Steam Temperature: 515 °C
Year of manufacture: 1985; equipment has received all prescribed maintenance to ensure maximum reliability, availability, and capacity.
Dimensions: 3,000 x 3,000 x 5,100 mm
Weight: 34,000 kg
Includes generator, gearbox, oil system, and all related electrical and instrumentation & control (I&C) equipment.
Comprehensive technical documentation available upon request.
Maintenance:
TG2 has been regularly maintained and serviced since commissioning. Major (GO) and medium (SO) overhauls have been conducted at approximately 5-year intervals, according to actual condition. Operation & Maintenance (O&M) was performed by the turbine manufacturer or certified specialists.
Crsdpfx Aowqp Edod Dsh
Last major O&M was conducted in 2010-2011 at a total cost of €47.3 million, covering:
- Rotor repair with new blading
- Stator flow section repair with new blading
- Replacement of quick-stop and control valve blocks
- Control system repair
- Oil system overhaul, pump repairs
- Steam system overhaul: valves, drains, replacement of hinged steam connections
The most recent overhaul (SO) was carried out in 2022-2023 at a total cost of €22 million, which included:
- Inspection of turbine flow section, cleaning, seal replacement, rotor balancing
- Overhaul and cleaning of oil system, inspection of oil pumps, installation of new radiator tubes
- Overhaul and repair of turbine control system and control safety system
- Inspection of steam pipes and valves
Routine maintenance and servicing were continuously performed during operation.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Penyedia
Catatan: Daftar gratis atau masuk, untuk mengakses semua informasi.
Terdaftar sejak: 2025
Kirim permintaan
Telepon & Faks
+420 370 ... iklan
Iklan-iklan ini juga mungkin menarik bagi Anda.
iklan kecil

10.489 km
Turbin uap
1. Brněnská strojírnaTurbogenerator set 25MW
1. Brněnská strojírnaTurbogenerator set 25MW
iklan kecil

10.489 km
Turbin uap
1. Brněnská strojírnaTurbogenerator set 25MW
1. Brněnská strojírnaTurbogenerator set 25MW
Iklan Anda telah berhasil dihapus
Terjadi kesalahan