Pembangkit listrik dan panas gabunganagriKomp GmbH
BGA/NGA168
Pembangkit listrik dan panas gabungan
agriKomp GmbH
BGA/NGA168
Tahun pembuatan
2024
Kondisi
Baru
Lokasi
Merkendorf 

Gambar menunjukkan
Tampilkan peta
Data mesin
- Nama mesin:
- Pembangkit listrik dan panas gabungan
- Pabrikan:
- agriKomp GmbH
- Model:
- BGA/NGA168
- Tahun pembuatan:
- 2024
- Kondisi:
- baru
- Fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
- Lokasi:
- Energiepark 2, 91732 Merkendorf, Deutschland

Hubungi
Rincian teknis
- Daya:
- 350 kW (475,87 hp)
Rincian penawaran
- ID iklan:
- A16761621
- Pembaruan:
- terakhir pada 09.09.2024
Deskripsi
Compact, high-efficiency combined heat and power plant (CHP) featuring a state-of-the-art SCANIA V8 lean-burn turbocharged 4-stroke gas Otto engine. The genset, gas pressure regulation section, mixture and engine water cooling circuit are mounted on a base frame for power and heat generation. Equipped with a high-quality synchronous generator (3 phase, 400V, 50Hz) for parallel grid operation and optimized heat extraction via plate heat exchanger for heating/process water with a temperature level of 85°C supply / 70°C return.
OPTIONAL: Fitted with a catalytic converter (optionally SCR system) for low-emission operation in accordance with MCP Directive (EU) and 44th BImSchV (DE).
TECHNICAL DATA
GENSET/CHP – Biogas 50% CH4
Itsdst Uu Ezjpfx Aahor
Electrical output at cos φ=1: 350 kWel
Electrical efficiency: 41.4 %
Thermal output from engine at 180°C exhaust temperature: 334 kWth
Electrical/thermal ratio: 1.05
Engine type: V8
Displacement: 16 L
Thermal input – 100% load: 845 kWel
Gas consumption at 50% CH4: 169.1 Nm³/h
Dimensions (L x W x H): 4.1 x 1.5 x 2.1 m
Weight (dry): 4500 kg
The CHP unit is equipped with a control cabinet featuring a display for visualization of all relevant operating parameters, including a DSL modem for remote maintenance and external monitoring, as well as an interface for control power integration with the E2M energy pilot. The delivery also includes a grid starter for optimal starting speed, gas detector, smoke detector, emergency stop switch, and alarm beacon/horn.
All pipelines are made of stainless steel (V2A) and insulated where necessary. To ensure the engine remains warm, installed heat pumps are programmed to operate in a defined cycle, maintaining the desired temperature.
An automatic gas shut-off valve for external mounting (outside the CHP installation room) is not included in the scope of delivery.
The CHP plant complies with the medium voltage guideline VDE-AR-N 4110:2018-11.
An automatic gas shut-off valve for installation outside the CHP housing and all operating fluids are not included in the supply scope.
The CHP can be supplied optionally in a container.
The entire genset is also available in a natural gas version.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
OPTIONAL: Fitted with a catalytic converter (optionally SCR system) for low-emission operation in accordance with MCP Directive (EU) and 44th BImSchV (DE).
TECHNICAL DATA
GENSET/CHP – Biogas 50% CH4
Itsdst Uu Ezjpfx Aahor
Electrical output at cos φ=1: 350 kWel
Electrical efficiency: 41.4 %
Thermal output from engine at 180°C exhaust temperature: 334 kWth
Electrical/thermal ratio: 1.05
Engine type: V8
Displacement: 16 L
Thermal input – 100% load: 845 kWel
Gas consumption at 50% CH4: 169.1 Nm³/h
Dimensions (L x W x H): 4.1 x 1.5 x 2.1 m
Weight (dry): 4500 kg
The CHP unit is equipped with a control cabinet featuring a display for visualization of all relevant operating parameters, including a DSL modem for remote maintenance and external monitoring, as well as an interface for control power integration with the E2M energy pilot. The delivery also includes a grid starter for optimal starting speed, gas detector, smoke detector, emergency stop switch, and alarm beacon/horn.
All pipelines are made of stainless steel (V2A) and insulated where necessary. To ensure the engine remains warm, installed heat pumps are programmed to operate in a defined cycle, maintaining the desired temperature.
An automatic gas shut-off valve for external mounting (outside the CHP installation room) is not included in the scope of delivery.
The CHP plant complies with the medium voltage guideline VDE-AR-N 4110:2018-11.
An automatic gas shut-off valve for installation outside the CHP housing and all operating fluids are not included in the supply scope.
The CHP can be supplied optionally in a container.
The entire genset is also available in a natural gas version.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Penyedia
Catatan: Daftar gratis atau masuk, untuk mengakses semua informasi.
Kirim permintaan
Telepon & Faks
+49 9826 ... iklan
Iklan-iklan ini juga mungkin menarik bagi Anda.
Iklan kecil
Sonsbeck
11.291 km
Pembangkit listrik dan panas gabungan
G2MWM
G2MWM
Iklan kecil
Irlandia
12.179 km
Colimatic Thermoformer 2021 € 29.990
Colimatic ThermoformerThera 450 L
Colimatic ThermoformerThera 450 L
Iklan kecil
Naprawa
10.377 km
Gergaji pita laminasi
TOPCUT500
TOPCUT500
Iklan kecil
Hessisch Lichtenau
11.072 km
Mesin pembengkok pipa, mesin pembengkok dorn, mesin pembengkok untuk pipa dan profil; dengan servomo
SIEMENS1FK6061-7AF71-1EG0
SIEMENS1FK6061-7AF71-1EG0
Iklan kecil
Osnabrück
11.165 km
Conveyor belt bunker conveyor
KlankeFBA1100
KlankeFBA1100
Iklan kecil
Vreden
11.252 km
Transformator
N/A800kVA
N/A800kVA
Iklan kecil
Wiefelstede
11.134 km
Stromerzeuger 3,8 kVA
MakitaG4300IS
MakitaG4300IS
Iklan kecil
Bruckmühl
10.976 km
Pembangkit listrik dan panas gabungan
JenbacherJGC 312 GS-N.LC
JenbacherJGC 312 GS-N.LC
Iklan kecil
Slovenia
10.764 km
Ketel uap
LOOS
LOOS
Iklan kecil
Olching
11.014 km
Mesin bubut CNC
ROMIC570
ROMIC570
Iklan Anda telah berhasil dihapus
Terjadi kesalahan








































































