Clean ROOM ISO 8
Clean ROOM ISO 8
EXW VB ditambah PPN
€50.000
Tahun pembuatan
2020
Kondisi
Bekas
(berfungsi sepenuhnya)
Lokasi
Łódź 

Data dasar
- Nama mesin:
- Clean ROOM ISO 8
- Tahun pembuatan:
- 2020
- Kondisi:
- sangat baik (bekas)
- Fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
EXW VB ditambah PPN
€50.000
- Lokasi:
- Łódź, Polandia

Hubungi
Rincian penawaran
- ID iklan:
- A14477200
- Pembaruan:
- terakhir pada 02.01.2024
Deskripsi
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Cedpfx Anoq H H Ruepjhd
Technical data attached to the photos.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Cedpfx Anoq H H Ruepjhd
Technical data attached to the photos.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Penyedia
Catatan: Daftar gratis atau masuk, untuk mengakses semua informasi.
Terdaftar sejak: 2023
1 Iklan online
Kirim permintaan
Telepon & Faks
+48 728 4... iklan
Iklan-iklan ini juga mungkin menarik bagi Anda.
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Rheinland-Pfalz
11.203 km
Mesin bubut penggerak tengah
MagdeburgCNC 604 MV
MagdeburgCNC 604 MV
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Emmendingen
11.271 km
Elumatec MGS142 Retrofit / APM Lupberger
ElumatecMGS142 mit Pusher
ElumatecMGS142 mit Pusher
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
England
11.801 km
Mesin sablon
KammannK9 V + K23
KammannK9 V + K23
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Województwo wielkopolskie
10.503 km
Forklift listrik 3 roda
LindeE 12-02
LindeE 12-02
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Wuppertal
11.246 km
Pers spot
HESSMERT160 EST
HESSMERT160 EST
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Województwo wielkopolskie
10.503 km
Forklift
LindeEFG 425k
LindeEFG 425k
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Województwo wielkopolskie
10.503 km
Forklift listrik 4 roda
JungheinrichEFG BC 330
JungheinrichEFG BC 330
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
St. Gallen
11.170 km
Sistem pembersihan ultrasonik
Ultraschallreinigungsanlage BR-80BR-80-M
Ultraschallreinigungsanlage BR-80BR-80-M
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Jihomoravský kraj
10.597 km
Mesin gergaji pita
Pegas GondaPEGAS 540 Horizont SHI
Pegas GondaPEGAS 540 Horizont SHI
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Jihomoravský kraj
10.597 km
Mesin gergaji pita
PEGAS GONDA510x510 HERKULES X
PEGAS GONDA510x510 HERKULES X
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Güglingen
11.168 km
Perangkat ventilasi, penangan udara, pendingin aula
IKGIKL150
IKGIKL150
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Jerman
10.821 km
Mesin gerinda silindris
GEIBEL & HOTZRS 2000 CNC
GEIBEL & HOTZRS 2000 CNC
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Nordrhein-Westfalen
11.185 km
Mesin bubut CNC
MazakSQT 250
MazakSQT 250
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Sprockhövel
11.238 km
Instalasi pengecatan serbuk otomatis penuh
Handelsagentur Klaus BeneckeDurchlaufanlage Pulverbeschichtung
Handelsagentur Klaus BeneckeDurchlaufanlage Pulverbeschichtung
Berhasil
Pesan Anda telah dikirim.
Lelang
Berakhir dalam
d
h
min
s
Lelang telah berakhir
Rheinland-Pfalz
11.203 km
Mesin bubut penggerak tengah
WMSC 704 MV
WMSC 704 MV
Iklan Anda telah berhasil dihapus
Terjadi kesalahan






















































































































































































































