Paint shopPony Luxury Coating
Pony L11000 (11x5x5)
Paint shop
Pony Luxury Coating
Pony L11000 (11x5x5)
Harga tetap ditambah PPN
€81.250
Tahun pembuatan
2025
Kondisi
Baru
(berfungsi sepenuhnya)
Lokasi
Würzburg 

Data dasar
- Nama mesin:
- Paint shop
- Pabrikan:
- Pony Luxury Coating
- Model:
- Pony L11000 (11x5x5)
- Tahun pembuatan:
- 2025
- Kondisi:
- baru
- Fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
Harga tetap ditambah PPN
€81.250
- Lokasi:
- Schulstr 3, 97084 Würzburg, Deutschland

Hubungi
Rincian teknis
Dimensi dan berat
Panjang total:
11.200 mm
Lebar total:
5.100 mm
Tinggi total:
5.600 mm
Tinggi dalam:
4.970 mm
Panjang dalam:
11.000 mm
Lebar dalam:
5.000 mm
Motor dan gearbox
Bahan bakar:
gas petroleum cair (LPG)
Detail tenaga
Tegangan masuk:
380 V
Frekuensi input:
50 Hz
Konsumsi energi:
45 kWh
Jenis arus masuk:
tiga fasa
Peralatan
Pencahayaan
Dokumentasi dan sertifikasi
Masa garansi:
24 bulan
Bahan/produk yang dapat diproses
Ketebalan pelat baja (maks.):
2 mm
Detail lebih lanjut
Daya:
45 kW (61,18 hp)
Kebutuhan udara:
52.000 m³/jam
Kapasitas pemanasan:
250 kW (339,91 hp)
Ketebalan isolasi:
50 mm
Daya nominal:
250 kW (339,91 hp)
Suhu:
80 °C
Rincian penawaran
- ID iklan:
- A19572531
- Pembaruan:
- terakhir pada 15.01.2026
Deskripsi
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
Dodpfswzl Hxjx Aavekw
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
Dodpfswzl Hxjx Aavekw
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Iklan ini diterjemahkan secara otomatis. Kesalahan terjemahan mungkin terjadi.
Dokumen
Penyedia
Catatan: Daftar gratis atau masuk, untuk mengakses semua informasi.
Terdaftar sejak: 2025
6 Iklan online
Kirim permintaan
Telepon & Faks
+49 931 4... iklan
Iklan-iklan ini juga mungkin menarik bagi Anda.
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Petershagen
11.102 km
Trailer low loader
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Kežmarok
10.339 km
Terowongan pengeringan UV
SuperficiEssiccatoio UV
SuperficiEssiccatoio UV
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Deskle
10.876 km
Unit sandblasting
COGEIMPG 10x15
COGEIMPG 10x15
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Gütersloh
11.147 km
Rundbiegemaschine Stölting RA 2000 x 8 mm
StöltingRA 2000 x 8 mm
StöltingRA 2000 x 8 mm
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Friesenheim
11.263 km
Mesin bending bulat
HaeuslerEVO 31031 4-Walzen Blechbiegemaschine
HaeuslerEVO 31031 4-Walzen Blechbiegemaschine
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Deskle
10.876 km
Unit peledakan pasir
TECNOBLASTGHIBLI 500 S - 9x13
TECNOBLASTGHIBLI 500 S - 9x13
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Finlandia
10.000 km
Unit sandblasting
Gietart
Gietart
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Büyükkayacık OSB
9.311 km
Mobil yang membawa semitrailer
LiderTruck Carrier 1
LiderTruck Carrier 1
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Eisenberg (Pfalz)
11.221 km
Pabrik pelapis bubuk
Gema, CaldanMagic Compact BA04, Hängebahnanlage Powe
Gema, CaldanMagic Compact BA04, Hängebahnanlage Powe
Berhasil
Pesan Anda telah dikirim.
Iklan kecil
Würzburg
11.085 km
Toko cat
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Iklan Anda telah berhasil dihapus
Terjadi kesalahan































































































